Changelog 12.2.13.401

In the preliminary structural design, actions can be changed again. When concealing wall connections, lamination and colours are applied again. Free articles can be added to wall connections again. In positions with add-ons, glazing bars can be inserted again. In positions with glazing bars, frame profiles can be changed again. [...]

Changelog 12.2.13.303

The structural analysis data of curtain wall positions can be opened again via the context menu - "Edit" - "Statics data". Curtain wall positions can be glazed again. In the input of elements, Curtain wall positions can be finished again. Horizontal couplings can be entered again. French casement window insertions [...]

Changelog 12.2.13.203

Projects, archived projects and fabrication phases can be opened from the home screen again. Bar lengths, residual lengths, residual quantities and special lengths can be opened again. Project glass is now also applied to linked fabrication phases. After finishing the estimation in a network environment, positions are retained again. Projects [...]

Changelog 12.2.12.602

Profiles with the clamp orientation status "Attached only" can be machined on the machining centre again. In the CNC company standard of Unilink CNC formats with and without cutting, the material analysis for depths can now be selected or deselected.

Changelog 12.2.13.102

CNC machining and CNC groups are now also applied to linked fabrication phases. The machining of project wall connections is now also applied to linked fabrication phases. In the glass/panel order and glass/panel request, the name of the glass configuration is displayed correctly again. The U-values for positions with fly [...]

Changelog 12.2.12.502

Insulating glass can be imported into the User Database again. KKP positions can be imported again. Special updates can be installed again. In the project plan, positions are displayed again in the view that was selected in the printout options. Positions with windows opening both in and out can be [...]

Changelog 12.2.12.403

Projects can now only be opened in a new window via the context menu. In the settings of the project center, the referring display mode has been removed. To open projects in a new window, right-click on a project and select the option "Open in seperate window" from the context [...]

Changelog 12.2.12.302

Fixed prices for text positions are displayed in the quotation again. Positions with top hung/side hung insertions can be edited again. Positions with glazing beads can be opened and edited again. The selection of glass and glazing bars is saved again. Positions with round arches can be drawn again in [...]

Changelog 12.2.12.203

Project profiles can again be used as all-around frame profiles in the input of elements. Door midrails can again be added to an existing position. Address changes are applied to the project header again. Sash assembly lists can be created again. In the system data of the User Database, the [...]

Go to Top