Changelog

The following additions and corrections were made in the latest update.

404, 2024

Changelog 12.2.13.401

Thursday, 4. April 2024|

  • In the preliminary structural design, actions can be changed again.
  • When concealing wall connections, lamination and colours are applied again.
  • Free articles can be added to wall connections again.
  • In positions with add-ons, glazing bars can be inserted again.
  • In positions with glazing bars, frame profiles can be changed again.
  • After changing position dimensions, the glass selection is checked again.
  • Adeco door panels can be inserted again in doors opening in.
  • Special prices can be imported again.
  • On orders, the spacer gaps are displayed correctly again.
  • On the CE marking and the declaration of performance the unit W/m²K to the thermal transmittance is now displayed.
  • When creating CNC files, drawings are transferred completely again.
  • When creating CNC files, DXF files are named correctly again.
  • Mecal XML saws now apply profile number substitutions.
603, 2024

Changelog 12.2.13.203

Wednesday, 6. March 2024|

  • Projects, archived projects and fabrication phases can be opened from the home screen again.
  • Bar lengths, residual lengths, residual quantities and special lengths can be opened again.
  • Project glass is now also applied to linked fabrication phases.
  • After finishing the estimation in a network environment, positions are retained again.
  • Projects can be deleted again.
  • The dimensions for Adeco door panels are displayed correctly again.
  • Job numbers and offer numbers can again be displayed via placeholders in filenames of printouts.
  • For quotations, the page break is correct again.
  • The printout for CE Mark Fire Protection is now available.
  • In glass/panel orders and glass/panel requests, the glass thickness is displayed correctly again.
  • When transferring a cross section to CAD, the settings for shown and hidden elements are applied correctly again.
  • Project additional article macros can be copied and deleted again.
  • The stability and performance have been optimised.
2602, 2024

Changelog 12.2.13.103

Monday, 26. February 2024|

  • The EOS can be used again.
2102, 2024

Changelog 12.2.13.102

Wednesday, 21. February 2024|

  • CNC machining and CNC groups are now also applied to linked fabrication phases.
  • The machining of project wall connections is now also applied to linked fabrication phases.
  • In the glass/panel order and glass/panel request, the name of the glass configuration is displayed correctly again.
  • The U-values for positions with fly screens are calculated correctly again.
  • Conservatories and cold roofs can be created again.
702, 2024

Changelog 12.2.12.602

Wednesday, 7. February 2024|

  • Profiles with the clamp orientation status "Attached only" can be machined on the machining centre again.
  • In the CNC company standard of Unilink CNC formats with and without cutting, the material analysis for depths can now be selected or deselected.
Go to Top