Changelog

812, 2025

Changelog 12.6.1.1004

Monday, 8. December 2025|

  • When editing a text elevation, the Project Center can now be reopened and the project accessed again.
  • Elevation properties can now be fully displayed on high-resolution monitors again.
  • When creating special prices, the selection can now be completed again.
  • Project profiles can now be used in additional articles again.
909, 2025

Changelog 12.6.1.700

Tuesday, 9. September 2025|

  • If static preferences are deactivated, no static query is carried out anymore.
  • Box and shaft for roller shutters are selected correctly again.
  • Machining of pull handles is displayed correctly again when offset.
  • Frame cuttings for elevations with ventilation elements are determined correctly again.
  • Machining of striking plates on the frame is aligned again with the lock axis of the insertion profile.
  • Special prices already stored in the estimation dataset are displayed again.
  • Insulation glass units can be imported again into the user database.
  • QR codes for Schüco locking bar machines are displayed correctly again.
1707, 2025

Changelog 12.6.1.303

Thursday, 17. July 2025|

  • Parts lists can be generated again.
  • Door hinges in hardware packages are now correctly assigned again, including finish and elevation selection.
  • When removing adjacent fields in combination with door packages, mullions are correctly maintained; cuts and machining are retained.
  • The partial width of door leaves can be modified again.
2706, 2025

Changelog 12.6.0.807

Friday, 27. June 2025|

  • The length and number of glazing beads is correctly calculated again for insertions with solid glass connections.
  • In curtain wall elevations, reinforcement profiles with defined area and profile splice are again correctly displayed on the parts list and printouts.
  • For elevations with leaf covering filling, hardware can be added again.
  • To increase the compatibility of our software with antivirus software and firewalls, the update system has been changed to the https protocol.
  • In the input of elements, additional articles with free machining can be opened again.
  • Cross sections can be saved again as one and as multiple pages.
  • In elevation frameworks, wall connections can be selected again.
  • In the grid input, fields can be deleted again.
  • The estimation can be transferred to Excel again via "Interfaces" > "Excel" > "Estimation" for elevations without phase assignment.
1006, 2025

Changelog 12.4.1.1702

Tuesday, 10. June 2025|

  • In the grid input, internal rails can be added again within arches.
  • The required connections are checked for the future update program.
Go to Top