Changelog 12.2.13.702

LOB files can be imported again. When changing the partial width in the input of element, the element geometry remains unchanged. The hardware information is displayed again above the barcode of the assembly list. Printouts with project text templates can be created again. The report "U-value excel export" can be [...]

Changelog 12.2.13.601

The Rodenberg configurator can now be updated to the "HTML5" version. Please contact Rodenberg before updating to "HTML5"! In the settings of the printout "Quotation" it is now possible to choose whether the information about the colours is displayed in detail, short or if no information is displayed on the [...]

Changelog 12.2.13.502

New users can be created again in the user database of network versions. Reports with the file format ".red" can be imported again.

Changelog 12.2.13.501

CE data with the status "automatic" is displayed completely again on CE printouts. Existing grid price lists can be edited again. In the project header, an address from the address database can again be selected in the "Customer" tab. Positions from the element price list can be created in the [...]

Changelog 12.2.13.401

In the preliminary structural design, actions can be changed again. When concealing wall connections, lamination and colours are applied again. Free articles can be added to wall connections again. In positions with add-ons, glazing bars can be inserted again. In positions with glazing bars, frame profiles can be changed again. [...]

Changelog 12.2.13.203

Projects, archived projects and fabrication phases can be opened from the home screen again. Bar lengths, residual lengths, residual quantities and special lengths can be opened again. Project glass is now also applied to linked fabrication phases. After finishing the estimation in a network environment, positions are retained again. Projects [...]

Changelog 12.2.13.102

CNC machining and CNC groups are now also applied to linked fabrication phases. The machining of project wall connections is now also applied to linked fabrication phases. In the glass/panel order and glass/panel request, the name of the glass configuration is displayed correctly again. The U-values for positions with fly [...]

Changelog 12.2.12.602

Profiles with the clamp orientation status "Attached only" can be machined on the machining centre again. In the CNC company standard of Unilink CNC formats with and without cutting, the material analysis for depths can now be selected or deselected.

Changelog 12.2.12.502

Insulating glass can be imported into the User Database again. KKP positions can be imported again. Special updates can be installed again. In the project plan, positions are displayed again in the view that was selected in the printout options. Positions with windows opening both in and out can be [...]

Go to Top