In the "Material packages" tab, you can define the labour hours for different material packages.
Note:
This feature depends on the system. Entries are only displayed here if relevant articles exist in the database of the selected system.
- Click the "Material packages" tab:
- Double-click a material package.
- Enter the labour hours to be calculated for each material package during assembly. The labour hours can be defined for piece and length articles.