1610, 2026
Přehled změn 14.0.2.204
- Positions can be completed again in projects with equal part detection enabled and containing glazing bars.
- In the Italian structural design module, wind load data can be entered and edited again.
- Project glass and project panels can be created again in the glazing section of the input of elements.
- The report for the preliminary structural design can be generated again for all positions in a project.
- For Qomet, CSV files can be created and transferred to the ERP system again.
- Supplier colours and custom finishes can be used together again in printouts.
1008, 2026
Přehled změn 12.6.1.1215
- Stabilita a výkon byly optimalizovány.
2304, 2026
Přehled změn 12.6.1.1210
- Invisible drainage can be set as the default again in the system data.
- For accessories (length) with stock length as the PU size, the quantity price list is calculated correctly again.
2303, 2026
Přehled změn 12.6.1.1207
- Nastavení pracovních časů je nyní opět plně zachováno.
- Výběr kování v zadávání prvku opět funguje.
903, 2026
Přehled změn 12.6.1.1206
- Dvoubarevné položky lze znovu použít ve vlastnostech pozice pro barevné kombinace s barvami dodavatele.
- V nových pozicích jsou neaktivní podbarvy pro kování opět skryté.
- Ve výtiscích objednávek jsou neaktivní dvoubarevné položky opět zobrazeny přeškrtnuté
2302, 2026
Přehled změn 12.6.1.1204
- Výška cylindrické vložky zůstává zarovnaná se spodní hranou křídla, bez ohledu na nakonfigurované spodní prodloužení.
- Zrcadlové PVC profily nyní dostávají pro speciální výrobu správné barevné přiřazení podle své skutečné orientace.
2301, 2026
Přehled změn 12.6.1.1202
- U‑value calculation is now performed correctly for separated frames, including lift‑and‑slide doors with a mullion section.
- Machining groups for top and bottom points can once again be assigned multiple times and are positioned correctly on the profile.
1712, 2025
Přehled změn 12.6.1.1102
- Free additional articles are now included again when creating printouts.
- Locking boxes on steel doors are now correctly aligned again.
- Conversion rates are now correctly applied again when calculating special glass prices.
1512, 2025
Přehled změn 12.6.1.1101
- When the quantity of a position already assigned to a fabrication phase is changed via an external ERP system through the interface, the quantity is now displayed correctly in the project, the fabrication phase, and the element management.
- In the Declaration of Performance, fire protection elements are correctly shown as fire protection elements, and other elements are not shown as fire protection elements.
- Bottom points are now executed only once for both intermediate and edge mullions.
- For the Schüco CC 800 corner connector machine, thresholds and bottom-rail profiles are now transferred.
- Profiles without drawings are no longer transferred to saws or CNC machines. A corresponding notification now appears when generating the machine file.
- A new saw format for Rotox ZGS 317 is now available.
812, 2025
Přehled změn 12.6.1.1004
- When editing a text position, the Project Centre can now be reopened and the project accessed again.
- Position properties can now be fully displayed on high-resolution monitors again.
- When creating special prices, the selection can now be completed again.
- Project profiles can now be used in additional articles again.